Single-circuit meter GSA pilot

Meazon announces the successful completion of the second phase of its single circuit meter technology evaluation by the US Department of Energy and the General Services Administration. The first phase of the evaluation was completed in 2017 with the emergence of Meazon as the only company whose technology met the standards of the US Department of Energy regarding the energy submetering of buildings.

During the second phase of evaluation, Meazon energy submeters were installed in a US government building to confirm the results of the first phase in the field. The results showed that Meazon technology provides those revolutionary features related to the Internet of Things, to be used in buildings for energy saving, preventive maintenance and tenant billing. The results of the second evaluation where presented in a special webinar that was organized on February 25th, 2021 at 1 pm ET USA. The webinar is available on demand in the link below.

Related links:

  1. Second phase results summary
  2. Second phase results full report 
  3. Webinar presentation slides
  4. Webinar recording